Experiences
Proven Positive Heritage Outcomes
Peet Palmview Residential
Aboriginal Cultural Heritage advisor for a proposed residential development. Tasks include negotiating Part 7 CHMP, ongoing negotiation with Aboriginal groups over impact mitigation, maintenance of Aboriginal site records, and supervision of on site cultural heritage works.
Queen’s Wharf
Cultural heritage advisor to Destination Brisbane Consortium (DBC). Tasks included consultation with the Aboriginal Parties for the area, technical advice, disturbance assessment, detailed management recommendations, and archaeological excavation supervision.
Logan Infrastructure Water Alliance Projects
Technical advisor to the Danggan Balun (Five Rivers) People for various projects with the Logan Water Infrastructure Alliance. Tasks included desktop assessment, archaeological survey, excavations and agreement negotiation.
Gold Coast Airport
Aboriginal Cultural Heritage technical advisor to large scale GCA development works. Works include managing legislative compliance, ongoing negotiation with Aboriginal groups and participation in surveys, clearances, and excavation at 33 archaeological test locations, much of which consisted of shell midden. Preparation of archaeological excavation reports and a Cultural Heritage Management Plan.
Pleistocene Modelling of Stradbroke and Moreton Islands - QYAC
To assist the Quandamooka Yoolooburrabee Aboriginal Corporation to discharge their Native Title Obligations, Everick developed a geoarchaeological model to predict where Pleistocene Archaeological sites might occur on Stradbroke and Moreton Islands.
DTMR Warrego Highway
Cultural Heritage Field Assessment including Aboriginal heritage for proposed road widening and tree clearing. Disturbance analysis, archaeological modelling, risk assessment and advice on legislative compliance.
DTMR Curry to Cooroy Upgrade
Cultural Heritage Field Assessment, heritage register searches, review of ethnographic and historic sources, disturbance analysis, predictive modelling, GIS modelling, engagement with stakeholders and legislative advice, and production of a detailed archaeological testing program.
BMA Technical Advisor (Bowen Basin)
Technical advisor to BMA on 15 mine sites and exploration leases. Tasks included CHMP compliance advice, archaeological surveys and internal management advice, internal systems and data management review, regional archaeological modelling and strategic advice.
Gladstone East End No. 5 Cement Mine
Aboriginal heritage assessment in support of an EIS and drafting / negotiation of a Part 7 Cultural Heritage Management Plan (CHMP). Assessment in preparation for Cement Australia’s 90 ha mine extension. Project tasks included survey, leading negotiations with Aboriginal parties and their technical advisor, and drafting a CHMP under Part 7 of the ACHA.
BHP Technical Advice (Bowen Basin)
Specialist advisor to BHP Billiton in preparation for a proposed 260 km infrastructure corridor and various mine sites. Provided advice on CHMP negotiations, archaeological modelling, risk assessment, advice on legislative compliance, and historic heritage assessment.
TMR Cloncurry and Mt Isa Aboriginal Heritage Assessment
A comprehensive survey and examination of known Aboriginal heritage sites to determine the accuracy, validity, and preservation. Also provided risk zoning and site data through field survey and detailed reporting to inform robust management advice.
Toowoomba Town Hall
Cultural heritage assessment, excavation of the site, cultural heritage recommendations and advice on development of the former Town Hall site, in association with historian Dr Thom Blake.
Bancroft Baths, Deception Bay
A historical and archaeological study of sea baths constructed in the 1880's. The project involved historical research and subsequent excavation of two bath sites. Undertaken in association with historian Dr Thom Blake.